• Third Aromatic Plant, Units 100~600
  • Construction / Erection, Include erection fixed & revolving Equipments, Steel Structure, Piping, Electrical, Instrument, Painting, Precommissioning and Assistance in commissioning of Units 100~600 of 3rd Aromatics Plant
more
  • Shahid Tondgooian Petrochemical
  • Construction / Erection/Fabrication Civil, Mechanical, Electrical, Instrumentation
more
  • Execution feed & Product pipe Lines
  • Construction / Erection Include Civil works, Fabrication / Erection of St. Str. & A.G. Pipe Lines
more
  • Erection 500 thousands barrel storage near the Pumping-station
  • To provide construct plans, procurement and delivery crude oil storage tank kind of the double wall & floating roof
more
  • South Pars Gas Field Development Project, Phases 6,7 and 8 (SP678-0X-41-003)
  • The project consist of piping, fabrication steel structure, equipment installation, insulation, fireproofing, painting & piping insulation works
more
  • Touss BOO Open Cycle Power Plant (6X159 MW)
  • Fuel System, Fire Fighting System, Service Air Compressor, Diesel Generator, Hoists & Crane
more
  • 3000 MW Power Plant Parand First phase: 960 MW Power Plant (6*GTG V94.2)
  • Parand Open Cycle Power Plant consist of six gas turbine generator of model V94.2. The gross output of each gas turbine generator shall be about 159 MW and the total gross output of the power plant shall be about 954 MW under ISO condition.
more
  • Extension of Gas Oil Storage Tanks Shahid Rajaei Combine Cycle Power Plant
  • Including UPH Building, F.F.P.H Building, Foam Tank Room, Concrete Pond Electrical, IPC, Civil Works, Fire Fighting
  • Contract Amount: 6,253,868 USD

more
  • Extension of Gas Oil Storage Tank Yazd Solar Thermal Power Plant
  • Civil Activities , Procurement and Installation in Equipment, Piping, Electrical and Instrument Fields
  • Contract Amount: 4,338,132 USD

more